I-25 Packages

Package 5: Fixed-Guideway Transit

This package adds a rail system (LRT or Self-Propelled Rail (DMU)) between Lincoln Avenue and Plum Creek Parkway.

Fixed-Guideway Transit - The transit system connects to the Southeast Corridor LRT system. Park-n-Ride stations are assumed to be located at the Southeast Corridor Terminus, Castle Pines Parkway, Meadows/Founders Parkway, and Plum Creek.

Alternate Routes - The I-25 Alternate Route that is included in this package is Crowfoot Valley Road. Crowfoot Valley Road improvements include upgrading Crowfoot Valley Road and Stroh Road to four-lane arterials between Founders Parkway and Parker Road. The US 85 Alternate Route: Extend US 85 is also included in this package.

Supporting Measures - Supporting Measures may include recommendations from the I-25 Interchange Study and Railroad Relocation Study, Transportation Demand Management (TDM) measures, Transportation System Management (TSM) measures, and Intelligent Transportation System (ITS) measures. These supporting measures include an emphasis on transit TDM and TSM. Enhancements/Mitigation measures are included as design elements.

Last Updated: 07.07.2008 04:13 PM

This is a Colorado Department of Transportation    Project Website!

SouthI-25@hdrinc.com