I-25 Packages

Package 4: Add Special Purpose Lanes with Regional Bus Service

This package adds one lane in each direction between Lincoln Avenue and Douglas Lane to be managed as a bus/HOV lane.

Highway - The special purpose lanes are designed to meet CDOT standards. Park-n-Ride lots are assumed to be located at the Southeast Corridor Terminus, Castle Pines Parkway, Meadows/Founders Parkway, and Plum Creek. The final configuration between Lincoln Avenue and Meadows/Founders Parkway is 2 general purpose lanes, 1 special purpose lane, and 1 climbing lane in each direction and south of Meadows/Founders Parkway is 2 general purpose lanes and 1 special purpose lane in each direction.

Alternate Routes - The I-25 Alternate Route that is included in this package is Crowfoot Valley Road. Crowfoot Valley Road improvements include upgrading Crowfoot Valley Road and Stroh Road to four-lane arterials between Founders Parkway and Parker Road. The US 85 Alternate Route: Extend US 85 is also included in this package.

Supporting Measures - Supporting Measures may include recommendations from the I-25 Interchange Study and Railroad Relocation Study, Transportation Demand Management (TDM) measures, Transportation System Management (TSM) measures, and Intelligent Transportation System (ITS) measures. These supporting measures include an emphasis on transit TDM and TSM. Enhancements/Mitigation measures are included as design elements.

Last Updated: 07.07.2008 04:13 PM

This is a Colorado Department of Transportation    Project Website!

SouthI-25@hdrinc.com