This package adds one lane in each direction for all uses between Lincoln Avenue and Douglas Lane to the No-Action Package.
Highway - The general purpose lanes are designed to meet CDOT standards. The final configuration between Lincoln Avenue and Meadows/Founders Parkway is 3 general purpose lanes and 1 climbing lane in each direction and south of Meadows/Founders Parkway is 3 general purpose lanes in each direction.
Alternate Routes - The I-25 Alternate Route that is included in this package is Crowfoot Valley Road. Crowfoot Valley Road improvements include upgrading Crowfoot Valley Road and Stroh Road to four-lane arterials between Founders Parkway and Parker Road. The US 85 Alternate Route: Extend US 85 is also included in this package.
Supporting Measures - Supporting Measures may include recommendations from the I-25 Interchange Study and Railroad Relocation Study, Transportation Demand Management (TDM) measures, Transportation System Management (TSM) measures, and Intelligent Transportation System (ITS) measures. Enhancements/Mitigation measures are included as design elements.
Last Updated:
07.07.2008 04:13 PM
This is a Colorado Department of
Transportation
Project
Website!
SouthI-25@hdrinc.com