The Colorado Department of Transportation (CDOT) has completed the
Environmental Impact
Statement (EIS) for the South I-25 Corridor and US 85 Corridor between
Lincoln Avenue and Castle Rock, and the Record of Decision has been signed.
In October of 2002, the ROD was revised. The revised version of this
document is now available on this site for viewing. (To see this document,
either click on the ROD icon to the right, or choose the Documents
link in the top navigation bar.)
The EIS process aimed at improving the transportation system by determining the specific areas of need,
identifying and addressing the issues, and evaluating the practical feasibility of the various design solutions. The final results is an overall strategy for transportation improvements along the corridor through the next 20 years and beyond.
Thank you for your participation in this study and your help in identifying the recommended improvements!
Brief history of the study:
- The study began in October 1998.
- Draft Environmental Impact Statement (DEIS) was released to the public on July 5th, 2000.
- The Final Environmental Impact Statement was released in May 2001.
- The Record of Decision was signed August 14, 2001.
-
The Record of Decision was revised in October 2002.
|