Project Home      Study Area Map       Purpose & Need       Project Description       Evaluation Process      
Alternatives Considered       Environmental Analysis       Documents       Supporting Agencies

Final Report

Final Environmental Impact Statement (FEIS)

Record of Decision (ROD)
(revised October 2002)

Final Environmental Impact Statement (FEIS)

Click to view the Final Environmental Impact Statement!
Click on the image of the report for the HTML version of the FEIS. Use one of the links to the right, for the PDF version of the FEIS.  
 

     


Abstract
Table of Contents
Conversion Table
List Of Figures
List Of Tables
Acronyms and Abbreviations
S.0 Summary
1.0 Purpose and Need
2.0 Alternatives
3.0 Travel Demand
4.0 Affected Environment
5.0 Environmental Consequences
6.0 Section 4(F) Evaluation
7.0 Mitigation
8.0 List of Preparers
9.0 List of Recipients
10.0 Availability of Technical Reports
11.0 Index

Please use this link if you need to download Adobe Acrobat Reader.
 

Abstract

This Final Environmental Impact Statement provides a detailed evaluation of the proposed improvements for the South I-25 Corridor and US 85 Corridor. The project corridors both lie within Douglas County, Colorado. The I-25 Corridor extends from C-470 at approximate milepost 195 to the southern limit of Castle Rock at approximate milepost 178 and the US 85 Corridor extends from C-470 at approximate milepost 200 to Castle Rock at approximate milepost 184. This Final Environmental Impact Statement includes an examination of the purpose and need, travel demand, alternatives under consideration, affected environment, environmental consequences, section 4(f) properties, and mitigation measures as a result of the proposed alternatives. Responses to the comments submitted for the Draft Environmental Impact Statement are included in Volume 2 of this Final Environmental Impact Statement.

Volume 2 and the technical reports are
available for agency and public review
at the following locations:

CDOT, Arapahoe Residency
359 Inverness Drive S.,
Suite K
Englewood, CO
80112

CDOT, Office of
Environmental Services
1325 S Colorado Blvd.,
Suite B400
Denver, CO
80222

CDOT, Region 1
18500 E Colfax Avenue
Aurora, CO
80010

City of Lone Tree
6399 S Fiddlers Green
Circle, Suite 102
Greenwood Village, CO
80111

Douglas County Planning
Department
100 Third Street
Castle Rock, CO
80104

Federal Highway
Administration
555 Zang Street,
Room 250
Lakewood, CO
80228

Highlands Ranch Library
9292 West Ridgeline
Highlands Ranch, CO
80129

Lone Tree Library
8827 Lone Tree Pkwy.
Lone Tree, CO
80124-8961

Louviers Library
7885 Louviers Blvd.
Louviers, CO
80131-9900

Parker Library
10851 S. Crossroads Dr.
Parker, CO
80134-9081

Philip S. Miller Library
961 S Plum Creek Road
Castle Rock, CO
80104

PBS&J
5500 Greenwood Plaza
Blvd., Suite 150
Englewood, CO
80111

Town of Castle Rock
100 Wilcox Street
Castle Rock, CO
80104

Record of Decision (ROD)

The Record of Decision (ROD) represents the Long-Term Vision (Preferred Strategy) after it has been refined. This document includes mitigation measures that were needed. After approval by CDOT and FHWA, design may begin. The ROD was signed on August 14, 2001, and then revised in October 2002 to meet the Regional Transportation Plan (RTP) set forth by DRCOG (the Denver Regional Council of Governments).

Click to view the Record of Decision!

     

Use one of the links below to view a PDF version of the specified sections of the ROD.  (Please use this link if you need to download Adobe Acrobat Reader.)


Table of Contents
List of Acronyms
Summary
1.0   Revised Decision
2.0   Planning & Development Changes
3.0   Oct. 2002 Selected Alternative
4.0   Section 4(f) Properties
5.0   Measures to Minimize Harm
6.0   Public Involvement
7.0   Monitoring/Enforcement Program
8.0   Conclusion
 

 

Last Updated: 03.28.2007 12:37 PM

This is a Colorado Department of Transportation    Project Website!

SouthI-25@hdrinc.com