US 85 Build Alternatives

Fixed Guideway

2. Push/Pull Commuter Rail (existing tracks)   "1 and 4"

5. Self-Propelled (DMU) (existing tracks)   "1 and 4"

8. Inter-City High Speed Rail (existing tracks)   "1 and 4"

9. Inter-City High Speed Rail (improved tracks)   "1"

10. Inter-City High Speed Rail (new tracks)   "1"

11. Monorail   "1 and 2"

12. Electric Trolley   "2"

Link Descriptions
"1" = Is not compatible with existing or planned transportation system.
"2" = Is not a proven technology in a comparable application.
"3" = Is not compatible with local goals and objectives.
"4" = Does not preserve future transit options.

Last Updated: 07.07.2008 04:13 PM

This is a Colorado Department of Transportation    Project Website!

SouthI-25@hdrinc.com