Project Description
Project Location
The overpass extends from the intersection of 5th Street and Jerry Street on the east side of I-25, over I-25 and Plum Creek, and connects to Park Street on the west side of I-25.
Construction Budget
The construction cost for the 5th Street Overpass project was approx. $3.7 million.
Detailed Improvement Description
|
Interstate Overpass Structure and Local Street Improvements
|
|
The design provides one 12-foot through traffic lane in each direction for 5th Street, beginning at Jerry Street east of I-25, continuing west over a new I-25 and Plum Creek overpass structure to connect to a similar section at Park Street west of I-25. The lanes each have a continuous 2-foot outside shoulder with standard curb and gutter. The lanes are separated by a double yellow line.
The project includes 10-foot parking lanes and 5-foot attached sidewalks along both sides of 5th Street east of I-25 and an 8-foot attached sidewalk on the south side that extends across I-25 to the Park Street connection.
|
|
Cross-Section of 5th Street East of I-25

|
|
Cross-Section of 5th Street Overpass Structure

|
|
Cross-Section of 5th Street West of I-25

|
|
The overpass structure is a three span haunched steel I-girder bridge with a concrete substructure and deck. A 3-inch asphalt overlay will be placed on the deck as a roadway wearing surface. (Remember to use our glossary to look up unfamiliar terms.)
|
|
The structure has been sized to accommodate the future expansion of I-25 which has been recommended by the South I-25 Corridor and US 85 Corridor EIS.
|
|
Other elements included with the project are standard handicap ramps, driveway cuts, stormwater drainage facilities, signing, striping, and street lighting.
|
Artist's simulation of proposed 5th Street and I-25
The photo-simulations below show the 5th Street location before construction, after completion of the overpass, and with the new I-25 laneage proposed by the South I-25 Corridor and US 85 Corridor EIS.
|
5th Street and I-25 Existing Conditions

|
|
5th Street and I-25 with Proposed Bridge

|
|
5th Street and I-25 with EIS I-25 Laneage

|
|