Looking north on I-25 at the existing interchange with US 85.
The northbound off ramp to US 85 will be closed during the later phases of the project. The existing bridge will be removed and a new bridge constructed. The new bridge will be in the approximate same location, but perpendicular to I-25. The bridge will be used to tie Front Street / Crowfoot Valley Road on the east side of I-25 to Santa Fe Drive on the west side. Local traffic will be able to cross I-25 to access the Justice Center and local businesses without using Meadows Parkway.The existing southbound on ramp from US 85 to I-25 will also be closed.
|
| |
Looking north on US 85 (Santa Fe) at the Meadows Parkway Intersection.
The intersection will be reconstructed with concrete pavement. At the top of the photo, US 85 will be widened to 3 lanes up to Castlegate Drive North (the cluster of apartments on the upper right). Meadows Parkway will be reconstructed with 3 lanes plus double left turns east (right) of the
intersection.
|
| |
Looking north at the intersection of Meadows Parkway and Factory Shops Blvd/Castleton Drive.
Meadows Parkway and the intersection will be reconstructed with 10" concrete pavement. Meadows will be widened to 3 through lanes from US 85 to the east side of the intersection. Most of the widening will use the
existing median. Double left turns from Meadows Parkway will be included at the intersection for both directions.
|
|
Aerial view of the US 85 & I-25 Interchange Relocation Project
|