Project Description
Location
The project is located along I-25, between the Castle Pines Parkway Interchange and the Meadows/Founders Parkway Interchange. The climbing lanes will be placed on the outside edge of I-25 in each direction.
Construction Budget
The Climbing Lanes, Phase II project construction budget is estimated at $33.6 million. The construction bid awarded was lower than the Engineer's design estimate.
Detailed Improvement Description
|
Minor Widening and Pavement Rehabilitation
|
|
The Climbing Lanes, Phase II project will consist of minor widening to the median and each side of I-25 to add an additional climbing lane in each direction as well as associated pavement rehabilitation. The climbing lanes will be constructed in concrete and tined* to facilitate roadway drainage and to ensure traction in poor weather. The project includes a middle concrete barrier dividing directions of travel. (*see our 'Glossary')

|
|
Other issues addressed during the design process included noise mitigation, archaeological/paleontological, erosion, hydraulics, utilities, traffic maintenance, and construction sequencing.
|
|
The final approved design does not preclude the improvements for I-25 which are recommended by the South I-25 Corridor and US 85 Corridor EIS.
|
|